Sofia Data Center Build

Full-scale rack, server, and network deployment for a global technology company - completed in Sofia, Bulgaria. Delivered on schedule with zero post-handover incidents.

Client Enterprise Tech Company
Location Sofia, Bulgaria
Scope Full build & commissioning
Status ✓ Completed
Data Center BuildNetwork InfrastructureField SupportStructured CablingFibre Optic
6 Racks
66 Servers
10 Switches
3 Cable types
0 Post-handover incidents
Project overview

What we built

TecharenaBG was engaged to design, physically build, and commission a complete data center environment for a global technology company's Sofia facility. The project encompassed full rack infrastructure, server installation, network switching, and three structured cabling systems - LAN, fibre optic, and power - all delivered to enterprise specification and handed over with full documentation.

The build was completed in a single continuous deployment window, with all 66 servers pre-staged and firmware-updated before arriving on site. This approach minimised disruption and allowed the full 6-rack row to go live within the agreed timeframe.

Project photos - Overview

The completed build

Full rack row and data center floor after installation.

Full rack row - all 6 cabinets installed

Overview

Data center floor view

Overview
Rack layout

Infrastructure at a glance

Simplified diagram of the 6-cabinet row - 11 servers and 1–2 switches per rack.

Rack 01

Rack 02

Rack 03

Rack 04

Rack 05

Rack 06

Server (1U) Network switch Empty / PDU space
Project photos - Detail

Servers, cabling & switching

Close-up shots of the installation work - servers, structured cabling, switch patching, and power.

Server rack closeup - 11 units per cabinet

Detail

Structured LAN and fibre cabling

Detail

Switch stack and uplink patching

Detail

PDU and power distribution wiring

Detail
Scope of work

What was delivered

6 full racks installed

Physical mounting, levelling, and securing

66 servers deployed

Racked, cabled, and firmware-configured

10 switches configured

VLANs, uplinks, and port documentation

LAN structured cabling

Cat6A patch panel termination, tested & certified

Fibre optic interconnects

Inter-rack and uplink fibre runs, OTDR tested

Power distribution

PDU install, redundant power paths, load balanced

Full documentation

Rack diagrams, IP schema, asset register

On-site handover

Team walkthrough and sign-off completed

Project photos - Before & After

Empty room to live data center

The transformation from an empty server room to a fully commissioned enterprise data center.

Empty rack cabinets before installation

Before

Completed rack after full installation

After

Empty server room before build

Before

Completed server room after build

After
Technical highlights

Key challenges solved

Cable management at scale

Managing LAN, fibre, and power across 6 racks simultaneously required strict colour-coding and route planning to keep the build maintainable long-term.

Zero-downtime commissioning

Servers were staged and pre-configured before physical installation, minimising on-site time and ensuring a clean first boot for all 66 units.

Switch topology design

10 switches distributed across 6 racks with redundant uplinks and a documented VLAN structure to meet the client's network segmentation requirements.

Fibre certification

All fibre runs were OTDR tested and certified before handover, giving the client baseline measurements for future troubleshooting.

Services involved

What went into this project

Planning a data center build?

Tell us your scope and timeline - we'll put together a detailed proposal within 48 hours.

Enterprise-grade reliability
Certified engineers
Full documentation & handover