Enterprise Client
Sofia Data Center Build
Full-scale rack, server, and network deployment for a global technology company - completed in Sofia, Bulgaria. Delivered on schedule with zero post-handover incidents.
What we built
TecharenaBG was engaged to design, physically build, and commission a complete data center environment for a global technology company's Sofia facility. The project encompassed full rack infrastructure, server installation, network switching, and three structured cabling systems - LAN, fibre optic, and power - all delivered to enterprise specification and handed over with full documentation.
The build was completed in a single continuous deployment window, with all 66 servers pre-staged and firmware-updated before arriving on site. This approach minimised disruption and allowed the full 6-rack row to go live within the agreed timeframe.
The completed build
Full rack row and data center floor after installation.
Full rack row - all 6 cabinets installed
OverviewData center floor view
OverviewInfrastructure at a glance
Simplified diagram of the 6-cabinet row - 11 servers and 1–2 switches per rack.
Rack 01
Rack 02
Rack 03
Rack 04
Rack 05
Rack 06
Servers, cabling & switching
Close-up shots of the installation work - servers, structured cabling, switch patching, and power.
Server rack closeup - 11 units per cabinet
DetailStructured LAN and fibre cabling
DetailSwitch stack and uplink patching
DetailPDU and power distribution wiring
DetailWhat was delivered
6 full racks installed
Physical mounting, levelling, and securing
66 servers deployed
Racked, cabled, and firmware-configured
10 switches configured
VLANs, uplinks, and port documentation
LAN structured cabling
Cat6A patch panel termination, tested & certified
Fibre optic interconnects
Inter-rack and uplink fibre runs, OTDR tested
Power distribution
PDU install, redundant power paths, load balanced
Full documentation
Rack diagrams, IP schema, asset register
On-site handover
Team walkthrough and sign-off completed
Empty room to live data center
The transformation from an empty server room to a fully commissioned enterprise data center.
Empty rack cabinets before installation
BeforeCompleted rack after full installation
AfterEmpty server room before build
BeforeCompleted server room after build
AfterKey challenges solved
Cable management at scale
Managing LAN, fibre, and power across 6 racks simultaneously required strict colour-coding and route planning to keep the build maintainable long-term.
Zero-downtime commissioning
Servers were staged and pre-configured before physical installation, minimising on-site time and ensuring a clean first boot for all 66 units.
Switch topology design
10 switches distributed across 6 racks with redundant uplinks and a documented VLAN structure to meet the client's network segmentation requirements.
Fibre certification
All fibre runs were OTDR tested and certified before handover, giving the client baseline measurements for future troubleshooting.
What went into this project